Extractor eléctrico de haces tubulares

Extractor eléctrico de haces tubulares

The electric heat exchanger bundle puller is a high-efficiency unit for petrochemical maintenance, driven by an electric motor and gear reducer with a sprocket-and-chain system to pull out and push in tube bundles. It supports manual, wired, and wireless remote operation, and its three-dimensional parametric structure ensures high strength, reliable performance, shorter shutdown time, and reduced labor costs.

Características principales

  • Powerful electric drive – Motor and gearbox with chain transmission for smooth, efficient pulling and pushing of heavy bundles.
  • Flexible operation modes – Supports manual, wired remote, and wireless remote control for safer, easier operation.
  • Compact and durable structure – Robust 3D-designed frame ensures high reliability, reduced downtime, and lower labor costs.
Solicitar cotización

15–100

Rango de fuerza de extracción (t)

15–100

Capacidad de carga del haz tubular (t)

6-15

Longitud del haz tubular (m)

1000–2800

Diámetro del haz tubular (mm)

Extractor eléctrico de haces tubulares Models and Technical Data

Customized designs are available. Maximum bundle length up to 15 m and higher pulling force can be provided on request.

MODELO QW15-6 QW25-6 QW45-12 QW60-9 QW75-12 QW85-12 QW100-15
Longitud máx. del haz (mm) 6000 6000 12000 9000 12000 12000 15000
Diámetro máx. del haz (mm) 1000 1400 1800 2200 2400 2600 2800
Fuerza máx. de extracción (t) 15 25 45 60 75 85 100
Carga máx. (t) 20 30 45 60 75 85 100
Peso propio (t) 3.5 4.8 9.3 9.6 13.2 17.2 20.2
Dimensiones generales (L×An×Al, mm) 9600×1200×1200 9600×1600×1230 15600×2000×1300 12600×2400×1450 15600×2600×1550 15600×2800×1750 18600×3000×1770
Potencia total (kW) 9 13.2 18 18 21.5 22.5 22.5

Pulling force test & verification

To ensure the safety and reliability of our bundle extractor, we carried out full-load pulling force tests on site.
Las principales condiciones de prueba fueron las siguientes:
Test machine: Electric bundle extractor 65 T (QW65 series)
Test load: up to 70 T simulated bundle weight
Duración de la prueba de extracción continua: 30 minutos
Result: no structural deformation, normal hydraulic temperature, stable pressure without leakage.
The test proves that the actual pulling capacity meets and exceeds the rated value, providing a safe margin for field operation.

Explore nuestras soluciones

Preguntas frecuentes sobre el extractor eléctrico de haces tubulares

Q1: For which operating conditions and industries is the electric bundle extractor mainly used?

R: This equipment is mainly used for extracting and reinstalling tube bundles of shell-and-tube heat exchangers. It is suitable for major overhauls, shutdown maintenance, and emergency repair operations in refineries, chemical plants, LNG plants, and power plants. It is particularly well suited for projects with heavy tube bundles, severe fouling, limited on-site space, and strict requirements on minimizing downtime.

Q2: How do I choose between 25T / 35T / 45T / 65T / 85T / 100T models with different pulling capacities?

R: La selección del modelo depende principalmente de tres parámetros:

  1. Maximum tube bundle weight (including fouling) – we recommend keeping a 20–30% safety margin.

  2. Tube bundle length – standard handling range is aprox. 6–15 m; beyond this can be customized.

  3. Site conditions – for example, whether there is heavy fouling and whether frequent continuous operation is required.

For instance, if the maximum tube bundle weight is 45 t, we recommend selecting the 65T model to ensure sufficient pulling force to deal with fouling and potential sticking.

Q3: What is the pulling capacity range of the equipment and what tube bundle sizes can it handle?

R: For standard models, the rated pulling capacity is approximately 25–100 tons. Los parámetros típicos del haz tubular que puede manejar son:

  • Longitud del haz tubular: aprox. 6–15 m

  • Diámetro del haz tubular: aprox. 1000–2800 mm

The exact applicability should be checked against the actual heat exchanger drawings, and we can verify the parameters and recommend a suitable model based on your project data.

Q4: What are the requirements for the foundation and on-site installation?

R:

  • A relatively flat and solid ground is required for placing the main unit and installing the rails.

  • The ground must have sufficient load-bearing capacity for the equipment weight and the tube bundle weight.

  • Reserve enough operating space in the length direction of the equipment so that the tube bundle can be fully extracted.

  • Confirm in advance the lifting conditions (crane capacity, lifting points, etc.).

If the site conditions are limited, we can provide simplified layout recommendations or customized solutions.

Q5: What is the delivery time? Is customization available?

R: For standard models without special customization, the typical delivery time is about 3–6 meses after order confirmation.
If you require special pulling capacity, extended rails, explosion-proof configuration, or other customized options, the delivery time may be slightly longer. The exact schedule will be confirmed in our official quotation and contract.